  {"id":54765,"date":"2019-03-25T10:51:00","date_gmt":"2019-03-25T14:51:00","guid":{"rendered":"https:\/\/newsroom.carleton.ca\/?p=54765"},"modified":"2025-08-19T09:36:37","modified_gmt":"2025-08-19T13:36:37","slug":"upcoming-work-to-open-raven-road-to-bronson-ave","status":"publish","type":"post","link":"https:\/\/carleton.ca\/news\/2019\/upcoming-work-to-open-raven-road-to-bronson-ave\/","title":{"rendered":"Upcoming Work to Open Raven Road to Bronson Ave."},"content":{"rendered":"\n<section class=\"w-screen px-6 cu-section cu-section--white ml-offset-center md:px-8 lg:px-14\">\n    <div class=\"space-y-6 cu-max-w-child-5xl  md:space-y-10 cu-prose-first-last\">\n\n            <div class=\"cu-textmedia flex flex-col lg:flex-row mx-auto gap-6 md:gap-10 my-6 md:my-12 first:mt-0 max-w-5xl\">\n        <div class=\"justify-start cu-textmedia-content cu-prose-first-last\" style=\"flex: 0 0 100%;\">\n            <header class=\"font-light prose-xl cu-pageheader md:prose-2xl cu-component-updated cu-prose-first-last\">\n                                    <h1 class=\"cu-prose-first-last font-semibold !mt-2 mb-4 md:mb-6 relative after:absolute after:h-px after:bottom-0 after:bg-cu-red after:left-px text-3xl md:text-4xl lg:text-5xl lg:leading-[3.5rem] pb-5 after:w-10 text-cu-black-700 not-prose\">\n                        Upcoming Work to Open Raven Road to Bronson Ave.\n                    <\/h1>\n                \n                                \n                            <\/header>\n\n                    <\/div>\n\n            <\/div>\n\n    <\/div>\n<\/section>\n\n<p>Over the last several months, 杏吧原创 University has been developing a strategy to best respond to the impacts of the closure of Hog&#8217;s Back swing bridge this summer and the shutdown of the O-Train in 2020 for Stage 2 LRT.<\/p>\n\n\n\n<p>These projects by the National Capital Commission (NCC) and the City of Ottawa are going to have a&nbsp;major impact on our campus. In summary:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hog&#8217;s Back Road will be closed for approximately nine months to all vehicles from Colonel By Dr. to Prince of Wales Dr., diverting a significant amount of traffic to the Bronson Ave. entrance to campus. Improved pedestrian\/cyclist access across the Hog\u2019s Back locks during construction is planned.<\/li>\n\n\n\n<li>During the O-Train shutdown, buses will replace train service for an estimated two years.<\/li>\n<\/ul>\n\n\n\n<p>The university is taking steps to mitigate increased traffic congestion on campus. As a first step, the university is in the process of receiving site plans and permit approval from the City of Ottawa to proceed with two projects:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Planning for Raven Road to be opened to Bronson Ave. as a left-in and a right-out for buses only is underway. Preparation begins on March 26-28 with the city drilling bore holes, and construction starting in June (date to be confirmed).<\/li>\n\n\n\n<li>Planning for the construction of a new road called Stadium Way that will connect Bronson Ave. and University Dr. through parking lot 5, near MNP Park is also underway. This would be as a right-in, right-out for cars only from Bronson Ave. Work is expected to begin in June (date to be confirmed).<\/li>\n<\/ol>\n\n\n\n<p>A <a href=\"https:\/\/carleton.ca\/transportationplan\" target=\"_blank\">dedicated website<\/a> has been created to house all information about these and future events. Information will be shared with the campus community as details are confirmed.<\/p>\n\n\n\n<p>We are in discussions with the National Capital Commission (NCC) and the City of Ottawa and will continue to keep those lines of communications open.&nbsp;Further updates will be provided to the 杏吧原创 community.<\/p>\n\n\n\n<p>Michel Pich\u00e9<br>\nVice-President (Finance and Administration)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Over the last several months, 杏吧原创 University has been developing a strategy to best respond to the impacts of the closure of Hog&#8217;s Back swing bridge this summer and the shutdown of the O-Train in 2020 for Stage 2 LRT. These projects by the National Capital Commission (NCC) and the City of Ottawa are going [&hellip;]<\/p>\n","protected":false},"author":410,"featured_media":53707,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[114],"tags":[],"class_list":["post-54765","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-campus-news"],"acf":{"cu_post_thumbnail":"blueprint"},"_links":{"self":[{"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/posts\/54765","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/users\/410"}],"replies":[{"embeddable":true,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/comments?post=54765"}],"version-history":[{"count":3,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/posts\/54765\/revisions"}],"predecessor-version":[{"id":54776,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/posts\/54765\/revisions\/54776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/media\/53707"}],"wp:attachment":[{"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/media?parent=54765"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/categories?post=54765"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/carleton.ca\/news\/wp-json\/wp\/v2\/tags?post=54765"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}